Parking Garage PT Repair
Full assessment and tendon replacement on a multi-level parking structure. Included failure investigation, repair procedure development, and concrete restoration.
Our Work
We have repaired or replaced more than 5,000 post-tension tendons, installed over 1,000,000 feet of barrier cable, and completed over 100 structural restoration projects across the southeastern United States.
Full assessment and tendon replacement on a multi-level parking structure. Included failure investigation, repair procedure development, and concrete restoration.
Complete barrier cable replacement including anchor hardware and stressing calculations for a commercial parking facility.
Comprehensive PT system assessment and condition report for a condominium complex, identifying areas requiring immediate repair.
Ground-penetrating radar scanning locate embedded tendons and rebar prior to core drilling.
Post-tension tendon repairs and concrete deck restoration on a coastal parking structure, including corrosion mitigation.
Full PT system inspection and failure investigation for a high-rise condominium, with repair procedure documentation.
Contact JM Bloom Construction to discuss your structural repair needs.
Get in Touch